Cyclone Mooring at Hay Point
As the late, great Chuck Mosely once sang, “It’s a dirty job, but someone’s gotta do it.” Our 26m work boat Pacific Titan repositions a cyclone mooring off Hay Point at the end of another highly productive bed levelling campaign. Her deck crane, double-drum reverse waterfall winch, and towing pins give our experienced operators and…
Details